Underground Coal

Industry leading optimisation tools for
underground coal mining operations

Powerful Industrial Mathematics

Optimise and model your complex open pit mining operations using industry leading mathematics.

Life of mine planning

Development planning & scheduling

Production planning & scheduling

Equipment dispatch & scheduling

Task dependency and lag timing

Ventilation

Strata Control

mhs

Match material handling systems

Gain the competitive advantage and increase profits today.

ORB Modules

ORB is able to generate plans across four modules that cover all time horizons in your stoping operations. Modules can be licensed individually or in combination to provide a holistic planning system.

Labels





  • Plan Resolution
  • Deployment Time

Real-time

Autonomously dispatch equipment to maximise strategic objectives.

  • Seconds
  • 3+ Months

Operational

Plan each shift down to the individual equipment level to defend against tactical plans.

  • Hourly
  • 2+ Months

Tactical

Manage development, construction, and production to defend strategic plans.

  • Shiftly / Weekly
  • 2+ Months

Strategic

Plan strategically to maximise Net Present Value of the ore body.

  • Monthly / Yearly
  • 8+ Weeks

Trusted By